Project Description
Location

Sillamäe

Construction period:

july 2009 – october 2009

Client:

Sillamäe SEJ AS

Heating pipeline in Sillamäe beach zone.

DN 400, line length 804 metres.

For the first time in Estonia, we used composite materials as a pipe bridge for spanning a river.